One million success stories. Start yours today.

Engineering Change Order (ECO) Coordinator/Drafter II

Date Posted: Jun 25, 2026
Yearly: £ - £
Job is expired

Job Detail

  • location_on
    Location Garden Grove, Baja California, United States of America
  • desktop_windows
    Job Type: Any
  • schedule
    Shift:
  • analytics
    Career Level:
  • group
    Positions:
  • calendar_view_day
    Experience:
  • male
    Gender: No Preference
  • school
    Degree:
  • calendar_month
    Apply Before: Sep 26, 2026

Job Description

Overview

The Engineering Change Order (ECO) Coordinator/Drafter II at FEI-Zyfer is responsible for performing standard drafting assignments, making adjustments in drawings, and managing engineering changes through the approval and release cycle. The role involves creating technical drawings for components and assemblies, verifying the accuracy of completed work, and chairing Change Control Board meetings.

Key responsibilities

  • Perform standard drafting assignments based on work orders
  • Make adjustments in drawings or specifications
  • Prepare working plans and detailed mechanical or electrical drawings
  • Manage engineering changes through the approval and release cycle
  • Chair the weekly Change Control Board meeting
  • Create assemblies and fabrication drawings using SolidWorks and AutoCAD
  • Check drawings and Bills of Materials (BOM) for correctness
  • Collaborate effectively with engineers and cross-functional stakeholders

Required skills

  • High School Diploma or equivalent (GED)
  • 3 to 5 years of experience in a CAD drafting environment using PLM systems
  • 3 to 5 years of experience creating assembly drawings and Bills of Materials (BOM)
  • Proficiency in SolidWorks and AutoCAD
  • Excellent oral and written communication skills
  • Ability to interpret technical drawings and blueprints
  • Attention to detail and spatial reasoning skills
  • Strong problem-solving and critical thinking abilities
  • Familiarity with Arena PLM/Empower systems
  • Knowledge of IPC standards

What the company offers

Not specified in the original listing.

Skills Required

Company Overview

Garden Grove, Baja California, United States of America

FEI-Zyfer specializes in providing high-quality engineering and manufacturing solutions. The company focuses on controlled engineering changes and standards to ensure product accuracy and efficiency. Read More

Google Map

Related Jobs