One million success stories. Start yours today.

Engineering Change Order (ECO) Coordinator/Drafter II

Date Posted: Jun 23, 2026
Yearly: USD - USD
Job is expired

Job Detail

  • location_on
    Location Garden Grove, Baja California, United States of America
  • desktop_windows
    Job Type: Permanent
  • schedule
    Shift:
  • analytics
    Career Level:
  • group
    Positions:
  • calendar_view_day
    Experience:
  • male
    Gender: No Preference
  • school
    Degree:
  • calendar_month
    Apply Before: Sep 21, 2026

Job Description

Overview

The Engineering Change Order (ECO) Coordinator/Drafter II at FEI-Zyfer is responsible for performing standard drafting assignments and managing engineering changes through an approval and release cycle. This role involves creating and verifying detailed mechanical and electrical drawings using CAD tools, while collaborating with engineers and the manufacturing team.

Key responsibilities

  • Manage engineering changes (ECO) through the approval and release cycle.
  • Chair the weekly Change Control Board (CCB) meeting.
  • Create assemblies and fabrication drawings using SolidWorks and AutoCAD.
  • Check drawings and Bills of Materials (BOM) for correctness.
  • Prepare working plans and detailed drawings from notes and sketches.
  • Perform other drafting duties as assigned.

Required skills

  • High School Diploma or equivalent (GED)
  • 3 to 5 years of experience in a CAD drafting environment
  • Proficiency with SolidWorks and AutoCAD software
  • Experience creating assembly drawings, fabrication drawings, and Engineering Change Orders (ECO)
  • Ability to interpret complex technical drawings and blueprints
  • Strong attention to detail and spatial reasoning skills
  • Excellent oral and written communication skills
  • Experience with PLM systems
  • Knowledge of IPC standards

What the company offers

Not specified in the original listing.

Skills Required

Company Overview

Garden Grove, Baja California, United States of America

FEI-Zyfer specializes in providing high-quality engineering and manufacturing solutions. The company focuses on controlled engineering changes and standards to ensure product accuracy and efficiency. Read More

Google Map

Related Jobs